Título: IMPLEMENTACIÓN DE CONSTRUCCIÓN VIRTUAL PARA MEJORAR LA PLANIFICACION DE OBRAS. USO DE MODELO 4D EN URBANISMO UBICADO EN VALENCIA, VENEZUELA
IMPLEMENTATION OF VIRTUAL CONSTRUCTION TO IMPROVE THE PLANNING OF WORKS. USE OF 4D MODEL IN URBANISM LOCATED IN VALENCIA, VENEZUELA
ISSN: 1856-9560
Fecha: 2016
Páginas/Colación: pp. 83-98
En:/ GACETA TÉCNICA Vol. 16 Nro. 1 Julio-Diciembre 2016
Información de existenciaInformación de existencia
Categoría Temática: Palabras: DIC01 DIC01
Palabras Claves del Autor: Palabras: BUILDING INFORMATION MODELING (BIM) BUILDING INFORMATION MODELING (BIM), Palabras: CONSTRUCCIÓN VIRTUAL CONSTRUCCIÓN VIRTUAL, Palabras: SIMULACIÓN 4D SIMULACIÓN 4D
Documentos asociados
Oprima aquí para visualizar el documento PDF:Documento en formato PDF Documento en formato PDF

RESUMEN
La industria de la construcción es considerada como una de las industrias con menores rendimientos, frecuentes retrasos y reprogramaciones. Debido a esto y para evitar pérdidas de tiempo, costos e inconvenientes en la ejecución, se utiliza la construcción virtual, que permite analizar previamente las secuencias constructivas y las posibles interferencias entre las diferentes actividades a través de un escenario en tiempo real según la programación prevista. Este artículo muestra la implementación de tecnología BIM en una urbanización de viviendas modulares en Venezuela. Se realizaron 4 simulaciones 4D, dos iniciales debido a la planificación original y su oportuna mejora, y dos posteriores correspondiente a reprogramaciones por retrasos reales en la ejecución por falta de suministro de concreto. Los principales resultados fueron: problemas de lógica de programación, interferencias entre actividades, secuencias irreales, entre otras en los primeros modelos. En cuanto a los modelos de las reprogramaciones dieron como resultados tiempos muy parecidos a la realidad; esto quiere decir que los modelos sirven tanto en situaciones ideales como en situaciones de incertidumbre. Las soluciones de modelado de información para la edificación introducen una nueva forma de trabajar, basada en la creación y el uso de información coherente y coordinada, lo que permite una toma de decisiones más rápida, una mejor documentación y la posibilidad de predecir los inconvenientes que pudieran presentarse, incluso antes de comenzar la obra.

Palabras clave: Building Information Modeling (BIM), construcción virtual, Simulación 4D

ABSTRACT

The construction industry is considered as one of the industries with lower yields, frequent delays and reprogramming. Due to this and to avoid losses of time, costs and inconveniences in the execution, the virtual construction is used, that allows to analyze previously the constructive sequences and the possible interferences between the different activities through a real time scenary according to the programmed schedule . This article shows the implementation of BIM technology in a modular housing development in Venezuela. Four 4D simulations were carried out, two initially due to the original planning and its timely improvement, and two subsequent corresponding to reprogramming due to actual delays in execution due to lack of concrete supply. The main results were: problems of programming logic, interferences between activities, unreal sequences, among others in the first models. As for the models of the reprogramming gave resulting times very similar to reality; This means that the models work both in ideal situations and in situations of uncertainty. Building information modeling solutions introduce a new way of working, based on the creation and use of coherent and coordinated information, wich allows for faster decision making, better documentation and the possibility of predicting the drawbacks Even before the work began.

Keywords: Building Information Modeling (BIM), virtual construction, 4D simulation

REFERENCIAS BIBLIOGRAFICAS
[1] E. Rodríguez, BIM-4D: “El tiempo añadido al modelado de información de construcción”. [Revista en Línea]// www.fierasdelaingenieria.com. Enero, 2012
[2] C. Martínez y M. Martínez. “Simulación de procesos constructivos utilizando tecnología 4D (Caso: Obra Parque la música Residencial)”. Trabajo especial de grado para optar al título de Ingeniero Civil. Barquisimeto, Venezuela: Universidad Centroccidental Lisandro Alvarado. (UCLA), 2009.
[3] J. R. Oropeza. “Evaluación la trazabilidad óptima de un proyecto de construcción de 50 viviendas multifamiliares, mediante modelos de simulación con tecnología 4D, proponiendo estrategias de control y seguimiento que soporten la toma de decisiones”. Trabajo especial de grado para optar al título de Ingeniero Civil. Barquisimeto, Venezuela: Universidad Centroccidental Lisandro Alvarado (UCLA). 2012.
[4] W. Kymmel. Building Information Modeling, Planning and Managing Construction Projects with 4D Cads and Simulations. McGraw-Hill Construction Series, 2008.
[5] J. Kunz, M. Fischer. "Virtual Design and Construction: Themes, Case Studies and Implementation Suggestions". CIFE Working Paper, 97, Version 14, 50, 2012. Disponible en: http://www.stanford.edu/group/CIFE/online.publications/WP097.pdf.
[6] BIMFORUM Forum Chile, Disponible en: http://www.bimforum.cl/
[7] R. O. Saldias. “Estimación de los beneficios de realizar una coordinación digital de proyectos con tecnologías BIM”. Santiago de Chile, Universidad de Chile, 2010.
[8] AUTODESK, “Manual del Usuario. Autodesk Navisworks Simulate 2012, 2011. http://download.autodesk.com/us/support/files/autodesk_navisworks_simulate_2012_user_guide_esp.pdf


 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 